I-85/385 INTERCHANGE IMPROVEMENTS

Market:

Water

Where:

SAN ANTONIO, TX

Client:

SAN ANTONIO RIVER AUTHORITY

Status:

Complete: May 2007 – May 2009

Contract Amount:

Confidential

Overview

Joint venture team Flatiron-Zachry will design and construct a $231 million design-build project for the South Carolina Department of Transportation (SCDOT) that will reconfigure the interchange at I-85 and I-385, improving traffic operations and safety for about 194,000 vehicles per day. Construction began in late fall 2015 and is scheduled for completion in 2020.

The project will replace existing loop ramps with direct-connect, high-level flyover bridges and includes construction of a new collector-distributor roadway along Interstates 85 and 385. The project also includes reconfiguration and replacement of existing ramps, construction of additional lanes along I-85 and I-385, resurfacing and rehabilitation of I-85. Crews will construct 12 new bridges, rehabilitate two existing bridges and construct mechanically stabilized earth (MSE) retaining walls. The project will also require extensive attention to traffic maintenance to minimize impact on the traveling public.

The new interchange will relieve congestion and increase safety on the third busiest interchange in South Carolina. The project is the state’s largest transportation infrastructure project in over a decade.

Related Projects

Pulvinar vivamus fringilla lacus nec metus bibendum egestas.

  • TXDOT SH 36 – JONES CREEK TO BRAZOS RIVER

    Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.

    Read More

  • IH30 FROM LINKCREST DR. TO IH820

    Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.

    Read More

  • HAYWOOD COUNTY BRIDGES – DIVISION 14

    The initial implementation of a detour and utilization of a temporary bridge opens up the project for the construction of the main interchange. This project is a 3-bridge interchange that will be…

    Read More

  • CPS ENERGY – URD CONTRACT

    Underground residential electric distribution and electrical terminations in existing subdivisions and apartments within CPS Energy’s service area. Rehabilitating direct buried cable to cable in…

    Read More

  • CCMA SCHERTZ 48 IN. GRAVITY SEWER LINE

    The project consists of the construction of a new Sewer Lift Station including abandonment and removal of the existing Sewer Lift Station located in Schertz, TX. The work includes the installation of…

    Read More

  • TYNDALL AFB – ZONE 1 CONCRETE PAVING

    The Tyndall Air Force Base, Florida, Zone 1 contract will deliver three aircraft maintenance unit hangars, a squadron maintenance complex, flight simulator facility, group headquarters, weapons load…

    Read More

  • CLT W RAMP DUAL TAXI LANE WIDENING

    The West Ramp Dual Taxilanes Paving and Lighting Project consists of grading, drainage, paving, and electrical work items to provide the capability to taxi two aircraft simultaneously around the west…

    Read More

  • CLT RAMP SECONDARY PCC

    Charlotte Douglas International Airport established a Secondary PCC Slab Replacement Program. This program will include the rehabilitation and replacement of various airfield Portland Cement Concrete…

    Read More

  • TXDOT IH35 WIDENING AT RED RIVER BRIDGE

    This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements,…

    Read More

Together We Can Do Great Things

Great infrastructure construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy