Proven Performance. Built to Last.
From sitework for industrial facilities to transportation infrastructure, our construction projects reflect the deep expertise and proven performance you can count on when you work with Zachry Construction. View our portfolio to see the work we’ve successfully delivered for our customers and what we can do for your projects.
-

DALLAS HIGH FIVE INTERCHANGE
The $288 million Dallas High Five Interchange project was a five-level interchange at the intersection of US 75 and IH 635, two of the busiest highways in North Texas, with a daily traffic count of…
-

HOUSTON SHIP CHANNEL BRIDGE EXPANSION
Ship Channel Constructors LLC (SCC), a joint venture between Zachry Construction Corporation and Traylor Bros., Inc., is constructing twin landmark cable-stayed bridges across the Houston Ship Channel while maintaining traffic on one of the region’s busiest roadways and waterways. The new bridges are designed to remove bridge foundations from the channel, supporting future widening and deepening of the waterway to accommodate larger vessels and strengthen the long-term capacity of the Port of Houston and the region’s maritime industry. Construction is being completed in phases, beginning with the new southbound bridge adjacent to the existing structure. The main span incorporates composite…
-

TXDOT IH35 WIDENING AT RED RIVER BRIDGE
This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements,…
-

TXDOT I-410 & I-35 INTERCHANGE NEX SOUTH
The project consists of the reconstruction of the Interstate 410 northbound and southbound mainlanes and frontage roads on either side of FM 78 and Binz Englemen. The project also includes the…
-

TXDOT SH 36 – JONES CREEK TO BRAZOS RIVER
Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.
-

IH30 FROM LINKCREST DR. TO IH820
Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.
-

HAYWOOD COUNTY BRIDGES – DIVISION 14
The initial implementation of a detour and utilization of a temporary bridge opens up the project for the construction of the main interchange. This project is a 3-bridge interchange that will be…
-

TYNDALL AFB – ZONE 1 CONCRETE PAVING
The Tyndall Air Force Base, Florida, Zone 1 contract will deliver three aircraft maintenance unit hangars, a squadron maintenance complex, flight simulator facility, group headquarters, weapons load…
-

CLT W RAMP DUAL TAXI LANE WIDENING
The West Ramp Dual Taxilanes Paving and Lighting Project consists of grading, drainage, paving, and electrical work items to provide the capability to taxi two aircraft simultaneously around the west…

