I-20 RANGER HILL ROAD

Market:

Water

Where:

SAN ANTONIO, TX

Client:

SAN ANTONIO RIVER AUTHORITY

Status:

Complete: May 2007 – May 2009

Contract Amount:

Confidential

Overview

Zachry was awarded the Eastland County Interstate Highway 20 (Ranger Road) project fromt the Texas Department of Transportation to realign existing roadway including grading, pavement, drainage, signage and road illumination. The project location is IH 20 from approximately 3.5 miles east of LP 254 to 0.5 miles east of State Highway 16. The project removes a rock hill that has caused numerous traffic accidents. The hill will be cut down to 65 foot to improve driver safety. The project has more than 1.2 million yards of embank material, large yellow iron equipment that includes D10’s, 374 excavators and portable crushers and more than 95,000 yards of paving.

Crews built a new 12-foot wide westbound climbing or passing lane. The stretch of highway has three westbound uphill main lanes to allow large trucks to use the outside lane for climbing without impeding smaller vehicles traveling at higher speeds. Two 12-foot wide eastbound downhill main lanes were provided along with space for future expansion to three lanes.

Related Projects

Pulvinar vivamus fringilla lacus nec metus bibendum egestas.

  • TXDOT SH 36 – JONES CREEK TO BRAZOS RIVER

    Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.

    Read More

  • IH30 FROM LINKCREST DR. TO IH820

    Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.

    Read More

  • HAYWOOD COUNTY BRIDGES – DIVISION 14

    The initial implementation of a detour and utilization of a temporary bridge opens up the project for the construction of the main interchange. This project is a 3-bridge interchange that will be…

    Read More

  • CPS ENERGY – URD CONTRACT

    Underground residential electric distribution and electrical terminations in existing subdivisions and apartments within CPS Energy’s service area. Rehabilitating direct buried cable to cable in…

    Read More

  • CCMA SCHERTZ 48 IN. GRAVITY SEWER LINE

    The project consists of the construction of a new Sewer Lift Station including abandonment and removal of the existing Sewer Lift Station located in Schertz, TX. The work includes the installation of…

    Read More

  • TYNDALL AFB – ZONE 1 CONCRETE PAVING

    The Tyndall Air Force Base, Florida, Zone 1 contract will deliver three aircraft maintenance unit hangars, a squadron maintenance complex, flight simulator facility, group headquarters, weapons load…

    Read More

  • CLT W RAMP DUAL TAXI LANE WIDENING

    The West Ramp Dual Taxilanes Paving and Lighting Project consists of grading, drainage, paving, and electrical work items to provide the capability to taxi two aircraft simultaneously around the west…

    Read More

  • CLT RAMP SECONDARY PCC

    Charlotte Douglas International Airport established a Secondary PCC Slab Replacement Program. This program will include the rehabilitation and replacement of various airfield Portland Cement Concrete…

    Read More

  • TXDOT IH35 WIDENING AT RED RIVER BRIDGE

    This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements,…

    Read More

Together We Can Do Great Things

Great infrastructure construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy