This is a two-phased demo and replacement of the existing structure over US 29 in Greensboro, NC. Each phase consists of bridge demo and replacement, MSE, shoring, and wire walls, storm drain, asphalt paving, and several more scopes of work. The existing bridge is a 4 spanned steel girder structure and the proposed structure will be a 2 span bridge consisting of concrete girders.












