SAWS BRACKISH GROUNDWATER DESALINATION PROJECT – PHASE I

Market:

Water

Where:

SAN ANTONIO, TX

Client:

SAN ANTONIO RIVER AUTHORITY

Status:

Complete: May 2007 – May 2009

Contract Amount:

Confidential

Overview

The San Antonio Water System (SAWS) desalination project, a Zachry-led joint venture, transforms brackish water into millions of gallons of drinkable water. SAWS and the City of San Antonio (CoSA) worked together to find an alternative source of water for San Antonio. The solution was to drill deeper, going up to 1,720 feet for the production supply wells and over 5,000 feet deep for the disposal wells.

This project is Phase I of the solution which included a 60,000-square-foot water treatment plant facility located at the previous SAWS Twin Oaks Aquifer Storage and Recovery site (3,000 acres).  The facility is now called H2Oaks and produces up to 12 million gallons of treated water per day through a reverse osmosis process in which salts and minerals are removed or desalination. The treatment plant involved a complicated process of mechanical, electrical and supervisory control and data acquisition (SCADA) – basically the brains of the plant controls systems; some of this equipment required many months lead times for manufacturing.

The project also included drilling four production wells and one injection well, the fit out of 12 production and two injection well sites, and installing over 12 miles of high density polyethylene (HDPE) – a thick walled piping that is somewhat flexible and “fused” (welded) together at the joints, conveyance pipeline and access roads to the remote well sites.  Zachry also provided start-up, commissioning and acceptance testing.

SAWS now uses H2Oaks as a public tour destination, with bus parking lanes, large observation areas, a conference room and a laboratory for college-level research projects. Phases II and III are expected to produce an additional 12 and 6 MGD, respectively, bringing the total capacity to 30 MGD by 2026 — the largest in Texas and the largest inland desalination plant in the country.

Phases II and III are expected to produce an additional 12 and 6 MGD, respectively, bringing the program’s total capacity to 30 MGD by 2026 — the largest in Texas and the largest inland desalination plant in the country.

Related Projects

Pulvinar vivamus fringilla lacus nec metus bibendum egestas.

  • TXDOT SH 36 – JONES CREEK TO BRAZOS RIVER

    Replacement and expansion of existing SH 36 to a 4-lane concrete roadway.

    Read More

  • IH30 FROM LINKCREST DR. TO IH820

    Reconstruction and widening of existing freeway consisting of bridge and walls construction, drainage, subgrade improvement, concrete pavement, traffic signals, ITS and High Mast illumination.

    Read More

  • HAYWOOD COUNTY BRIDGES – DIVISION 14

    The initial implementation of a detour and utilization of a temporary bridge opens up the project for the construction of the main interchange. This project is a 3-bridge interchange that will be…

    Read More

  • CPS ENERGY – URD CONTRACT

    Underground residential electric distribution and electrical terminations in existing subdivisions and apartments within CPS Energy’s service area. Rehabilitating direct buried cable to cable in…

    Read More

  • CCMA SCHERTZ 48 IN. GRAVITY SEWER LINE

    The project consists of the construction of a new Sewer Lift Station including abandonment and removal of the existing Sewer Lift Station located in Schertz, TX. The work includes the installation of…

    Read More

  • TYNDALL AFB – ZONE 1 CONCRETE PAVING

    The Tyndall Air Force Base, Florida, Zone 1 contract will deliver three aircraft maintenance unit hangars, a squadron maintenance complex, flight simulator facility, group headquarters, weapons load…

    Read More

  • CLT W RAMP DUAL TAXI LANE WIDENING

    The West Ramp Dual Taxilanes Paving and Lighting Project consists of grading, drainage, paving, and electrical work items to provide the capability to taxi two aircraft simultaneously around the west…

    Read More

  • CLT RAMP SECONDARY PCC

    Charlotte Douglas International Airport established a Secondary PCC Slab Replacement Program. This program will include the rehabilitation and replacement of various airfield Portland Cement Concrete…

    Read More

  • TXDOT IH35 WIDENING AT RED RIVER BRIDGE

    This is an eight-mile joint venture project with Austin Bridge & Road consisting of three new bridges over Red River and BNSF Railroad, adding mainline bridges over FM1202, drainage improvements,…

    Read More

Together We Can Do Great Things

Great infrastructure construction projects start with great partnerships. Reach out today, and let’s build something extraordinary together.

Contact Us

© 2026 Zachry Construction Corporation. All rights reserved.

Zachry Corporation
Privacy Policy